Current through Vol. 42, No. 8, January 2, 2025
Section 252:653-7-4 - Additional application requirements for infiltration basinsIn addition to the requirements of OAC 252:653-7-2, permit applications for the construction of infiltration basins shall include the following:
(1) construction details to include: (A) number of infiltration basin(s);(B) dimensions of the infiltration basin(s), including: (i) surface area in acres;(ii) depth and horizontal extent of trenches or other excavations to increase recharge;(ii) maximum depth of water in basin; and(iii) freeboard allowance(C) gradients and elevations;(D) method of construction;(E) materials used; (i) soil type and permeability; (F) erosion control measures;(G) flood control features;(H) inflow and outflow/overflow points; (I) measurement points; and (J) monitoring equipment.(2) operating parameters: (A) schedule of hydraulic loading and basin drying cycles;(C) estimated infiltration rate for each basin;(D) estimated hydraulic loading rate with consideration given to drying time; and(E) distance to maintain between bottom of basin and top of groundwater mound(4) any additional information DEQ determines to be necessary for the specific ASR project.Okla. Admin. Code § 252:653-7-4
Adopted by Oklahoma Register, Volume 35, Issue 24, September 4, 2018, eff. 9/15/2018