Current through Vol. 42, No. 8, January 2, 2025
Section 252:653-7-3 - Additional application requirements for recharge wellsIn addition to the requirements of OAC 252:653-7-2, permit applications for the construction of recharge wells shall include the following:
(1) construction details to include, at a minimum, depth and diameter of casings and screens (or open hole completion), description of the installation method, construction features and specifications for the materials to be used;(2) plugging and abandonment plan;(3) proposed injection procedure;(4) proposed operating data: (A) average and maximum daily injection rates and volumes for each well;(B) average and maximum injection pressure; and(C) description of the injectate parameters to be monitored;(5) any additional information DEQ determines to be necessary for the specific ASR project.Okla. Admin. Code § 252:653-7-3
Adopted by Oklahoma Register, Volume 35, Issue 24, September 4, 2018, eff. 9/15/2018