Okla. Admin. Code § 252:517-19-2

Current through Vol. 42, No. 7, December 16, 2024
Section 252:517-19-2 - Notification requirements
(a)DEQ notification. The notifications required under paragraphs (e) through (i) of this Section must be sent to the DEQ before the close of business on the day the notification is required to be completed. For purposes of this Section, before the close of business means the notification must be postmarked or sent by electronic mail (email). If a notification deadline falls on a weekend or federal holiday, the notification deadline is automatically extended to the next business day. For those plans requiring approval by DEQ, submittal of the plan constitutes notification.
(b)Combining notifications. Notifications may be combined as long as the deadline requirement for each notification is met.
(c)Notification required. Unless otherwise required in this Section, the notifications specified in this Section must be sent to the DEQ within 30 days of placing in the operating record the information required by OAC 252:517-19-1.
(d)Location restrictions. The owner or operator of a CCR unit subject to the requirements of this Chapter must notify the DEQ that each demonstration specified under OAC 252:517-19-1(e) has been placed in the operating record and on the owner or operator's publicly accessible internet site.
(e)Design criteria. The owner or operator of a CCR unit subject to this Chapter must notify the DEQ when information has been placed in the operating record and on the owner or operator's publicly accessible internet site. The owner or operator must:
(1) Within 60 days of commencing construction of a new CCR unit, provide notification of the availability of the design certification specified under OAC 252:517-19-1(f)(1) or (3). If the owner or operator of the CCR unit elects to install an alternative composite liner, the owner or operator must also submit to the DEQ a copy of the alternative composite liner design.
(2) No later than the date of initial receipt of CCR by a new CCR unit, provide notification of the availability of the construction certification specified under OAC 252:517-19-1(f)(1) or (3).
(3) Provide notification of the availability of the documentation of liner type specified under OAC 252:517-19-1(f)(2).
(4) Provide notification of the availability of the initial and periodic hazard potential classification assessments specified under OAC 252:517-19-1(f)(5).
(5) Provide notification of the availability of emergency action plan (EAP), and any revisions of the EAP, specified under OAC 252:517-19-1(f)(6).
(6) Provide notification of the availability of documentation prepared by the owner or operator recording the annual face-to-face meeting or exercise between representatives of the owner or operator of the CCR unit and the local emergency responders specified under OAC 252:517-19-1(f)(7).
(7) Provide notification of documentation prepared by the owner or operator recording all activations of the emergency action plan specified under OAC 252:517-19-1(f)(8).
(8) Provide notification of the availability of the history of construction, and any revision of it, specified under OAC 252:517-19-1(f)(9).
(9) Provide notification of the availability of the initial and periodic structural stability assessments specified under OAC 252:517-19-1(f)(10).
(10) Provide notification of the availability of the documentation detailing the corrective measures taken to remedy the deficiency or release specified under OAC 252:517-19-1(f)(11).
(11) Provide notification of the availability of the initial and periodic safety factor assessments specified under OAC 252:517-19-1(f)(12).
(12) Provide notification of the availability of the design and construction plans, and any revision of them, specified under OAC 252:517-19-1(f)(13).
(f)Operating criteria. The owner or operator of a CCR unit subject to this Chapter must notify the DEQ when information has been placed in the operating record and on the owner or operator's publicly accessible internet site. The owner or operator must:
(1) Provide notification of the availability of the CCR fugitive dust control plan, or any subsequent amendment of the plan, specified under OAC 252:517-19-1(g)(1).
(2) Provide notification of the availability of the annual CCR fugitive dust control report specified under OAC 252:517-19-1(g)(2).
(3) Provide notification of the availability of the initial and periodic run-on and run-off control system plans specified under OAC 252:517-19-1(g)(3).
(4) Provide notification of the availability of the initial and periodic inflow design flood control system plans specified under OAC 252:517-19-1(g)(4).
(5) Provide notification of the availability of the periodic inspection reports specified under OAC 252:517-19-1(g)(6).
(6) Provide notification of the availability of the documentation detailing the corrective measures taken to remedy the deficiency or release specified under OAC 252:517-19-1(g)(7).
(7) Provide notification of the availability of the periodic inspection reports specified under OAC 252:517-19-1(g)(9).
(g)Groundwater monitoring and corrective action. The owner or operator of a CCR unit subject to this Chapter must notify the DEQ when information has been placed in the operating record and on the owner or operator's publicly accessible internet site. The owner or operator must:
(1) Provide notification of the availability of the annual groundwater monitoring and corrective action report specified under OAC 252:517-19-1(h)(1).
(2) Provide notification of the availability of the groundwater monitoring system certification specified under OAC 252:517-19-1(h)(3).
(3) Provide notification of the availability of the selection of a statistical method certification specified under OAC 252:517-19-1(h)(4).
(4) Provide notification that an assessment monitoring programs has been established specified under OAC 252:517-19-1(h)(5).
(5) Provide notification that the CCR unit is returning to a detection monitoring program specified under OAC 252:517-19-1(h)(7).
(6) Provide notification that one or more constituents in Appendix B to this Chapter have been detected at statistically significant levels above the groundwater protection standard and the notifications to land owners specified under OAC 252:517-19-1(h)(8).
(7) Provide notification that an assessment of corrective measures has been initiated specified under OAC 252:517-19-1(h)(9).
(8) Provide notification of the availability of assessment of corrective measures specified under OAC 252:517-19-1(h)(10).
(9) Provide notification of the availability of the semiannual report describing the progress in selecting and designing the remedy and the selection of remedy report specified under OAC 252:517-19-1(h)(12).
(10) Provide notification of the completion of the remedy specified under OAC 252:517-19-1(h)(13).
(h)Closure and post-closure care. The owner or operator of a CCR unit subject to this Chapter must notify the DEQ when information has been placed in the operating record and on the owner or operator's publicly accessible Internet site. The owner or operator must:
(1) Provide notification of the intent to initiate closure of the CCR unit specified under OAC 252:517-19-1(i)(1).
(2) Provide notification of the availability of the annual progress reports of closure implementation specified under OAC 252:517-19-1(i)(2).
(3) Provide notification of closure completion specified under OAC 252:517-19-1(i)(3).
(4) Provide notification of the availability of the written closure plan, and any amendment of the plan, specified under OAC 252:517-19-1(i)(4).
(5) Provide notification of the availability of the demonstration(s) for a time extension for initiating closure specified under OAC 252:517-19-1(i)(5).
(6) Provide notification of the availability of the demonstration(s) for a time extension for completing closure specified under OAC 252:517-19-1(i)(6).
(7) Provide notification of intent to close a CCR unit specified under OAC 252:517-19-1(i)(7).
(8) Provide notification of completion of closure of a CCR unit specified under OAC 252:517-19-1(i)(8).
(9) Provide notification of the deed notation as required by OAC 252:517-19-1(i)(9).
(10) Provide notification of intent to comply with the alternative closure requirements specified under OAC 252:517-19-1(i)(10).
(11) The annual progress reports under the alternative closure requirements as required by OAC 252:517-19-1(i)(11).
(12) Provide notification of the availability of the written post-closure plan, and any amendment of the plan, specified under OAC 252:517-19-1(i)(12).
(13) Provide notification of completion of post-closure care specified under OAC 252:517-19-1(i)(13).
(14) Provide the notification of intent to comply with the site-specific alternative to initiation of closure due to development of alternative capacity infeasible as specified under OAC 252:517-19-1(i)(14).
(15) Provide the approved or denied demonstration for the site-specific alternative to initiation of closure due to development of alternative capacity infeasible specified under OAC 252:517-19-1(i)(15).
(16) Provide the notification for requesting additional time to the alternative cease receipt of waste deadline as required by OAC 252:517-19-1(i)(16).
(17) The semi-annual progress reports for the site-specific alternative to initiation of closure due to development of alternative capacity infeasible as specified under OAC 252:517-19-1(i)(17).
(18) Provide the notification of intent to comply with the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boiler(s) by a date certain as specified under OAC 252:517-19-1(i)(18).
(19) Provide the approved or denied demonstration for the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boiler(s) by a date certain as required by OAC 252:517-19-1(i)(19).
(20) The annual progress report for the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boiler(s) by a date certain as required by OAC 252:517-19-1(i)(20).
(i)Retrofit criteria. The owner or operator of a CCR unit subject to this Chapter must notify the DEQ when information has been placed in the operating record and on the owner or operator's publicly accessible Internet site. The owner or operator must:
(1) Provide notification of the availability of the written retrofit plan, and any amendment of the plan, specified under OAC 252:517-19-1(k) (1).
(2) Provide notification of intent to comply with the alternative retrofit requirements specified under OAC 252:517-19-1(k) (2).
(3) The annual progress reports under the alternative retrofit requirements as required by OAC 252:517-19-1(k) (3).
(4) Provide notification of the availability of the demonstration(s) for a time extension for completing retrofit activities specified under OAC 252:517-19-1(k) (4).
(5) Provide notification of intent to initiate retrofit of a CCR unit specified under OAC 252:517-19-1(k) (5).
(6) Provide notification of completion of retrofit activities specified under OAC 252:517-19-1(k) (6).

Okla. Admin. Code § 252:517-19-2

Adopted by Oklahoma Register, Volume 33, Issue 24, September 1, 2016, eff. 9/15/2016
Amended by Oklahoma Register, Volume 38, Issue 24, September 1, 2021, eff. 9/15/2021