Okla. Admin. Code § 252:517-19-3

Current through Vol. 42, No. 3, October 15, 2024
Section 252:517-19-3 - Publicly accessible internet site requirements
(a)Applicability. Each owner or operator of a CCR unit subject to the requirements of this Chapter must maintain a publicly accessible Internet site (CCR Web site) containing the information specified in this Section. The owner or operator's Web site must be titled "CCR Rule Compliance Data and Information." The website must ensure that all information required to be posted is immediately available to anyone visiting the site, without requiring any prerequisite, such as registration or a requirement to submit a document request. All required information must be clearly identifiable and must be able to be immediately printed and downloaded by anyone accessing the site. If the owner/operator changes the web address (i.e., Uniform Resource Locator (URL)) at any point, they must notify DEQ within 14 days of making the change. The facility's CCR website must also have a ''contact us'' form or a specific email address posted on the website for the public to use to submit questions and issues relating to the availability of information on the website.
(b)Multiple CCR units. An owner or operator of more than one CCR unit subject to the provisions of this Chapter may comply with the requirements of this Section by using the same Internet site for multiple CCR units provided the CCR Web site clearly delineates information by the name or identification number of each unit.
(c)Website records retention. Unless otherwise required in this Section, the information required to be posted to the CCR Web site must be made available to the public for at least five years following the date on which the information was first posted to the CCR Web site.
(d)Timeline for posting to website. Unless otherwise required in this Section, the information must be posted to the CCR Web site within 30 days of placing the pertinent information required by OAC 252:517-19-1 in the operating record.
(e)Location restrictions. The owner or operator of a CCR unit subject to this Chapter must place each demonstration specified under OAC 252:517-19-1(e) on the owner or operator's CCR Web site.
(f)Design criteria. The owner or operator of a CCR unit subject to this Chapter must place the following information on the owner or operator's CCR Web site:
(1) Within 60 days of commencing construction of a new unit, the design certification specified under OAC 252:517-19-1(f)(1) or (3).
(2) No later than the date of initial receipt of CCR by a new CCR unit, the construction certification specified under OAC 252:517-19-1(f)(1) or (3).
(3) The documentation of liner type specified under OAC 252:517-19-1(f)(2).
(4) The initial and periodic hazard potential classification assessments specified under OAC 252:517-19-1(f)(5).
(5) The emergency action plan (EAP) specified under OAC 252:517-19-1(f)(6), except that only the most recent EAP must be maintained on the CCR Web site irrespective of the time requirement specified in paragraph (c) of this Section.
(6) Documentation prepared by the owner or operator recording the annual face-to-face meeting or exercise between representatives of the owner or operator of the CCR unit and the local emergency responders specified under OAC 252:517-19-1(f)(7).
(7) Documentation prepared by the owner or operator recording any activation of the emergency action plan specified under OAC 252:517-19-1(f)(8).
(8) The history of construction, and any revisions of it, specified under OAC 252:517-19-1(f)(9).
(9) The initial and periodic structural stability assessments specified under OAC 252:517-19-1(f)(10).
(10) The documentation detailing the corrective measures taken to remedy the deficiency or release specified under OAC 252:517-19-1(f)(11).
(11) The initial and periodic safety factor assessments specified under OAC 252:517-19-1(f)(12).
(12) The design and construction plans, and any revisions of them, specified under OAC 252:517-19-1(f)(13).
(g)Operating criteria. The owner or operator of a CCR unit subject to this Chapter must place the following information on the owner or operator's CCR Web site:
(1) The CCR fugitive dust control plan, or any subsequent amendment of the plan, specified under OAC 252:517-19-1(g)(1) except that only the most recent plan must be maintained on the CCR Web site irrespective of the time requirement specified in paragraph (c) of this Section.
(2) The annual CCR fugitive dust control report specified under OAC 252:517-19-1(g)(2).
(3) The initial and periodic run-on and run-off control system plans specified under OAC 252:517-19-1(g)(3).
(4) The initial and periodic inflow design flood control system plans specified under OAC 252:517-19-1(g)(4).
(5) The periodic inspection reports specified under OAC 252:517-19-1(g)(6).
(6) The documentation detailing the corrective measures taken to remedy the deficiency or release specified under OAC 252:517-19-1(g)(7).
(7) The periodic inspection reports specified under OAC 252:517-19-1(g)(9).
(h)Groundwater monitoring and corrective action. The owner or operator of a CCR unit subject to this Chapter must place the following information on the owner or operator's CCR Web site:
(1) The annual groundwater monitoring and corrective action report specified under OAC 252:517-19-1(h)(1).
(2) The groundwater monitoring system certification specified under OAC 252:517-19-1(h)(3).
(3) The selection of a statistical method certification specified under OAC 252:517-19-1(h)(4).
(4) The notification that an assessment monitoring programs has been established specified under OAC 252:517-19-1(h)(5).
(5) The notification that the CCR unit is returning to a detection monitoring program specified under OAC 252:517-19-1(h)(7).
(6) The notification that one or more constituents in Appendix B to this Chapter have been detected at statistically significant levels above the groundwater protection standard and the notifications to land owners specified under OAC 252:517-19-1(h)(8).
(7) The notification that an assessment of corrective measures has been initiated specified under OAC 252:517-19-1(h)(9).
(8) The assessment of corrective measures specified under OAC 252:517-19-1(h)(10).
(9) The semiannual reports describing the progress in selecting and designing remedy and the selection of remedy report specified under OAC 252:517-19-1(h)(12), except that the selection of the remedy report must be maintained until the remedy has been completed.
(10) The notification that the remedy has been completed specified under OAC 252:517-19-1(h)(13).
(i)Closure and post-closure care. The owner or operator of a CCR unit subject to this Chapter must place the following information on the owner or operator's CCR Web site:
(1) The notification of intent to initiate closure of the CCR unit specified under OAC 252:517-19-1(i)(1).
(2) The annual progress reports of closure implementation specified under OAC 252:517-19-1(i)(2).
(3) The notification of closure completion specified under OAC 252:517-19-1(i)(3).
(4) The written closure plan, and any amendment of the plan, specified under OAC 252:517-19-1(i)(4).
(5) The demonstration(s) for a time extension for initiating closure specified under OAC 252:517-19-1(i)(5).
(6) The demonstration(s) for a time extension for completing closure specified under OAC 252:517-19-1(i)(6).
(7) The notification of intent to close a CCR unit specified under OAC 252:517-19-1(i)(7).
(8) The notification of completion of closure of a CCR unit specified under OAC 252:517-19-1(i)(8).
(9) The notification recording a notation on the deed as required by OAC 252:517-19-1(i)(9).
(10) The notification of intent to comply with the alternative closure requirements as required by OAC 252:517-19-1(i)(10).
(11) The annual progress reports under the alternative closure requirements as required by OAC 252:517-19-1(i)(11).
(12) The written post-closure plan, and any amendment of the plan, specified under OAC 252:517-19-1(i)(12).
(13) The notification of completion of post-closure care specified under OAC 252:517-19-1(i)(13).
(14) The notification of intent to comply with the site-specific alternative to initiation of closure due to development of alternative capacity infeasible as specified under OAC 252:517-19-1(i)(14).
(15) The approved or denied demonstration for the site-specific alternative to initiation of closure due to development of alternative capacity infeasible specified under OAC 252:517-19-1(i)(15).
(16) The notification for requesting additional time to the alternative cease receipt of waste deadline as required by OAC 252:517-19-1(i)(16).
(17) The semi-annual progress reports for the site-specific alternative to initiation of closure due to development of alternative capacity infeasible as specified under OAC 252:517-19-1(i)(17).
(18) The notification of intent to comply with the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boiler(s) by a date certain as specified under OAC 252:517-19-1(i)(18).
(19) The approved or denied demonstration for the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boiler(s) by a date certain as required by OAC 252:517-19-1(i)(19).
(20) The annual progress report for the site-specific alternative to initiation of closure due to permanent cessation of a coal-fired boiler(s) by a date certain as required by OAC 252:517-19-1(i)(20).
(j)Retrofit criteria. The owner or operator of a CCR unit subject to this Chapter must place the following information on the owner or operator's CCR Web site:
(1) The written retrofit plan, and any amendment of the plan, specified under OAC 252:517-19-1(k) (1).
(2) The notification of intent to comply with the alternative retrofit requirements as required by OAC 252:517-19-1(k) (2).
(3) The annual progress reports under the alternative retrofit requirements as required by OAC 252:517-19-1(k) (3).
(4) The demonstration(s) for a time extension for completing retrofit activities specified under OAC 252:517-19-1(k) (4).
(5) The notification of intent to retrofit a CCR unit specified under OAC 252:517-19-1(k) (5).
(6) The notification of completion of retrofit activities specified under OAC 252:517-19-1(k) (6).

Okla. Admin. Code § 252:517-19-3

Adopted by Oklahoma Register, Volume 33, Issue 24, September 1, 2016, eff. 9/15/2016
Amended by Oklahoma Register, Volume 38, Issue 24, September 1, 2021, eff. 9/15/2021