Current through December 31, 2024
Section 349.420 - Application by municipal obligor: Effect; filing; fee; form and contentsIf prior written approval is given by the Director, an application of a municipal obligor constitutes the preliminary and final plan for the water project. The application must:
1. Be filed with the Board at the address provided in NAC 349.220;2. Be accompanied by the application fee required by subsection 1 of NAC 349.290; and3. Be in the form provided by the Director. The application must include:(a) The name of the municipal obligor;(b) The qualifications of the municipal obligor;(c) The location of the water project;(d) The costs of the water project;(e) The benefits of the water project;(f) The marketability of any bonds to be sold, including an analysis of their legal status; and(g) The names of legal counsel and engineers retained to assist the municipal obligor.Nev. Admin. Code § 349.420
Added to NAC by Dep't of Commerce, eff. 11-13-90; A 7-6-92