327 Ind. Admin. Code 8-3.4-7

Current through January 8, 2025
Section 327 IAC 8-3.4-7 - Required easements, other permits

Authority: IC 13-14-8; IC 13-15-1-2; IC 13-15-2-1; IC 13-18-3-1; IC 13-18-4-1

Affected: IC 13-11-2; IC 13-13-5-1; IC 13-18-2

Sec. 7.

(a) An easement, deed restriction, or right-of-way granted for a production well must:
(1) prohibit the construction of any permanent structure, with the exception of structures associated with the housing of the well equipment, over the production well; and
(2) provide access to the production well site for maintenance purposes.
(b) A permit or exemption required by another goverrmient entity for a production well must be obtained prior to the commencement of construction under this rule.

327 IAC 8-3.4-7

Water Pollution Control Board; 327 IAC 8-3.4-7; filed Jun 17, 1999, 1:50 p.m.: 22 IR 3370; readopted filed Jan 10, 2001, 3:23 p.m.: 24 IR 1518; readopted filed Nov 21, 2007, 1:16 p.m.: 20071219-IR-327070553BFA; readopted filed Jul 29, 2013, 9:21 a.m.: 20130828-IR-327130176BFA
Readopted filed Jun 14, 2019, 1:59 p.m.: 20190710-IR-327190246BFA