Ga. Comp. R. & Regs. 110-2-8-.15

Current through Rules and Regulations filed through December 24, 2024
Rule 110-2-8-.15 - Changes to Approved Building System Documentation

Where the manufacturer proposes to change any portion of its system design or if these rules or the state construction codes are amended to necessitate such change, the manufacturer shall be required to submit to the Commissioner a minimum of three (3) sets of supplemental documentation. Documentation shall be accompanied by an application form, obtainable from the Commissioner, and the appropriate fee pursuant to the fee schedule of these rules. If the Commissioner determines that the supplemental documentation does not constitute a change to the existing approval, the supplements will be filed with, and become a part of the existing approval of recognition.

Ga. Comp. R. & Regs. R. 110-2-8-.15

O.C.G.A. Sec. 8-2-113.

Original Rule entitled "Changes to Approved Building System Documentation" adopted. F. Sept. 25, 2000; eff. Oct. 15, 2000.
Repealed: New Rule of same title adopted. F. Mar. 4, 2003; eff. Apr. 1, 2003, as specified by the Agency.