Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 27.155 - Reporting of Injection and Recovery Volumes(a) A project operator shall install a meter on each ASR injection well and ASR recovery well associated with the aquifer storage and recovery project.(b) Each calendar month, the project operator shall provide to the commission a written or electronic report showing for the preceding calendar month the volume of water: (1) injected for storage; and(2) recovered for beneficial use.Added by Acts 2015, Texas Acts of the 84th Leg. - Regular Session, ch. 505,Sec. 3, eff. 6/16/2015.