Current with legislation from the 2023 Regular and Special Sessions signed by the Governor as of November 21, 2023.
Section 27.154 - Technical Standards(a) The commission shall adopt technical standards governing the approval of the use of a Class V injection well as an ASR injection well.(b) This subsection applies only to an aquifer storage and recovery project proposed to be located in a groundwater conservation district or other special-purpose district with the authority to regulate the withdrawal of groundwater. Except as otherwise provided by this section, the commission shall limit the volume of water that may be recovered by an aquifer storage and recovery project to an amount that does not exceed the amount of water injected under the project. If the commission determines that the proposed injection of water into a geologic formation will result in a loss of injected water or native groundwater, the commission shall impose additional restrictions on the amount of water that may be recovered to account for the loss. The commission may not deny a permit based on a determination that a loss described by this subsection will occur. A limitation imposed under this subsection may not prohibit the production of native groundwater by an aquifer storage and recovery project if the production complies with Subchapter N, Chapter 36.(c) The commission by rule shall prescribe construction and completion standards and metering and reporting requirements for ASR injection wells and ASR recovery wells, including for an ASR injection well that also serves as an ASR recovery well.(d) The commission may not adopt or enforce groundwater quality protection standards for the quality of water injected into an ASR injection well that are more stringent than applicable federal standards.Added by Acts 2015, Texas Acts of the 84th Leg. - Regular Session, ch. 505,Sec. 3, eff. 6/16/2015.