Current through P.L. 171-2024
Section 8-23-9.5-11 - "Project"(a) As used in this chapter, "project" means services provided using a two-phase contract with a CMGC or a PDB for preconstruction services and construction services to design, construct, alter, or repair:(2) a limited access facility (as defined in IC 8-23-1-28);(3) a public highway (as defined in IC 9-25-2-4);(6) a passenger and freight railroad system.(b) The term does not include a passenger railroad system that is operated by a commuter transportation district created by IC 8-5-15.Added by P.L. 60-2023,SEC. 2, eff. 7/1/2023.