As used in this chapter, "PDB" or "progressive design-builder" refers to a person that has been awarded a contract by the department in which design services, preconstruction services, and construction services of a project are procured from a person that is selected through a qualifications based selection process at the earliest feasible stage of the project.
IC 8-23-9.5-10