Cal. Pub. Util. Code § 454.53

Current through the 2024 Legislative Session.
Section 454.53 - [Effective Until 1/1/2025] State policy regarding renewable energy resources and zero-carbon resources
(a) It is the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90 percent of all retail sales of electricity to California end-use customers by December 31, 2035, 95 percent of all retail sales of electricity to California end-use customers by December 31, 2040, 100 percent of all retail sales of electricity to California end-use customers by December 31, 2045, and 100 percent of electricity procured to serve all state agencies by December 31, 2035. The achievement of this policy for California shall not increase carbon emissions elsewhere in the western grid and shall not allow resource shuffling. The commission and Energy Commission, in consultation with the State Air Resources Board, shall take steps to ensure that a transition to a zero-carbon electric system for the State of California does not cause or contribute to greenhouse gas emissions increases elsewhere in the western grid, and is undertaken in a manner consistent with clause 3 of Section 8 of Article I of the United States Constitution. The commission, the Energy Commission, the State Air Resources Board, and all other state agencies shall incorporate this policy into all relevant planning.
(b) The commission, Energy Commission, State Air Resources Board, and all other state agencies shall ensure that actions taken in furtherance of subdivision (a) do all of the following:
(1) Maintain and protect the safety, reliable operation, and balancing of the electric system.
(2) Prevent unreasonable impacts to electricity, gas, and water customer rates and bills resulting from implementation of this section, taking into full consideration the economic and environmental costs and benefits of renewable energy and zero-carbon resources.
(3) To the extent feasible and authorized under law, lead to the adoption of policies and taking of actions in other sectors to obtain greenhouse gas emission reductions that ensure equity between other sectors and the electricity sector.
(4) Not affect in any manner the rules and requirements for the oversight of, and enforcement against, retail sellers and local publicly owned utilities pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3) and Sections 454.51, 454.52, 9621, and 9622.
(5) Not consider the energy, capacity, or any attribute from the Diablo Canyon Unit 1 or Unit 2 powerplant after August 26, 2025, in achieving the policy described in subdivision (a).
(c) This section does not affect a retail seller's obligation to comply with the federal Public Utility Regulatory Policies Act of 1978 (16 U.S.C. Sec. 2601 et seq.).
(d) The commission, Energy Commission, and State Air Resources Board shall do all of the following:
(1) Use programs authorized under existing statutes to achieve the policy described in subdivision (a).
(2) In consultation with all California balancing authorities, as defined in subdivision (d) of Section 399.12, as part of a public process, issue a joint report to the Legislature by January 1, 2021, and at least every four years thereafter. The joint report shall include all of the following:
(A) A review of the policy described in subdivision (a) focused on technologies, forecasts, then-existing transmission, and maintaining safety, environmental and public safety protection, affordability, and system and local reliability.
(B) An evaluation identifying the potential benefits and impacts on system and local reliability associated with achieving the policy described in subdivision (a).
(C) An evaluation identifying the nature of any anticipated financial costs and benefits to electric, gas, and water utilities, including customer rate impacts and benefits.
(D) The barriers to, and benefits of, achieving the policy described in subdivision (a).
(E) Alternative scenarios in which the policy described in subdivision (a) can be achieved and the estimated costs and benefits of each scenario.
(3) On or before December 1, 2023, and annually thereafter, in consultation with California balancing authorities, as defined in subdivision (d) of Section 399.12, and as part of, or an interim addendum to, the quadrennial joint report required by paragraph (2), as applicable, issue a joint reliability progress report that reviews system and local reliability within the context of the policy described in subdivision (a), with a particular focus on summer reliability. The joint reliability progress report shall identify challenges and gaps, if any, to achieving system and local reliability and identify the amount and cause of any delays to achieving compliance with all energy and capacity procurement requirements set by the commission.
(e) This section does not authorize the commission to establish any requirements on a nonmobile self-cogeneration or cogeneration facility that served onsite load, or that served load pursuant to an over-the-fence arrangement if that arrangement existed on or before December 20, 1995.
(f) This section does not limit any entity, including local governments, from accelerating their achievement of the state's electric sector decarbonization targets.

Ca. Pub. Util. Code § 454.53

Amended by Stats 2023 ch 53 (SB 124),s 7, eff. 7/10/2023.
Amended by Stats 2022 ch 361 (SB 1020),s 4, eff. 1/1/2023.
Amended by Stats 2022 ch 239 (SB 846),s 7, eff. 9/2/2022.
Added by Stats 2018 ch 312 (SB 100),s 5, eff. 1/1/2019.
This section is set out more than once due to postponed, multiple, or conflicting amendments.