(a) An electrical wiring permit shall be obtained prior to beginning any new construction or remodeling of any building, mobile home, or premises if the work will require a public utility to connect or disconnect and restore electrical power. Electrical permits are not required for installations exempt under W.S. 35-9-123(a)(ii) through (v), unless the electrical work is being performed by a person or company acting as a subcontractor for the exempt person, partnership, or corporation and the electrical work is governed by the National Electrical Code. This section does not apply in municipalities and counties granted local enforcement authority for electrical safety standards under W.S. W.S. 35-9-121.
(b) Permits shall be obtained prior to the start of any installation requiring a permit pursuant to W.S. W.S. 35-9-120. Failure to obtain a permit prior to the starting of the electrical installation may result in criminal penalties as set forth in W.S. W.S. 35-9-130. Failure to obtain an electrical permit prior to the starting of electrical installation may result in revocation or suspension of Wyoming electrical license.
(c) Electrical permits may be obtained from the Chief Electrical Inspector, or may be made available through the local utility, local governmental agencies, or other entities, as determined by the Chief Electrical Inspector.
(d) A fee of $50.00 shall be paid for any electrical wiring permit issued by the Department. The electrical wiring permit fee shall be waived for anyone requesting and paying for an electrical inspection.
041-7 Wyo. Code R. § 7-1