020-3 Wyo. Code R. § 3-4

Current through April 27, 2019
Section 3-4 - Prohibitions

No person, except when authorized by permit issued pursuant to the Act and these regulations, shall:

(a) Construct, install, or modify any public water supply, sewerage system, treatment works, disposal system or other facility capable of causing or contributing to pollution;

(b) Construct, install, or modify any facility in non-compliance with the terms and conditions of an issued permit;

(c) Construct, install, or modify a facility with a permit that has expired or has been suspended or revoked;

(d) Commence construction or modification of any industrial facility capable of causing or increasing water pollution in excess of standards established by the department before a permit is obtained pursuant to W.S. 35-11-801(c);

(e) Discharge wastes into an exempted or permitted treatment works, sewerage or disposal system that are inconsistent with the type or quantity of wastes for which the facility is designed;

(f) Land apply or surface dispose of biosolids or domestic septage; or

(g) Reuse treated wastewater.

020-3 Wyo. Code R. § 3-4

Amended, Eff. 6/29/2018.