020-11 Wyo. Code R. § 11-5

Current through April 27, 2019
Section 11-5 - Facilities and Systems Not Specifically Covered by These Standards

This section is provided to encourage new technology and equipment and provide a process for evaluating and permitting designs that deviate from these regulations. The proposed construction of facilities and processes not in compliance with these regulations will be permitted provided that the facility, when constructed, can operate meeting the purpose of these regulations.

(a) Each application for a permit to construct a facility under this section shall be evaluated on a case-by-case basis using the best available technology. The following information should be included with the application:

  • (i) Data obtained from a full scale, comparable installation that demonstrates the acceptability of the design and/or,
  • (ii) Data obtained from a pilot plant operated under the design condition for a sufficient length of time to demonstrate the acceptability of the design and/or,
  • (iii) Data obtained from a theoretical evaluation of the design that demonstrates a reasonable probability of the facility meeting the design objectives; and
  • (iv) An evaluation of the flexibility of making corrective changes to the constructed facility in the event it does not function as planned.

(b) If an applicant wishes to construct a pilot plant to provide the data necessary to show the design will meet the purpose of the act, a permit to construct must be obtained.

020-11 Wyo. Code R. § 11-5

Amended, Eff. 6/29/2018.