Section PSC 113.0816 - Servicing utilization control equipment
(1) Utilities shall service and maintain any equipment they use on customers' premises so as to provide service in accordance with the rate provisions.
(2) Systems and devices used by the utility to control customer metering and loads shall be tested or checked on installation and periodically thereafter, if necessary, to verify proper operation.