Wis. Admin. Code Public Service Commission PSC 113.0815

Current through October 28, 2024
Section PSC 113.0815 - Type of instruments

All electric service of the same type rendered under the same rate schedule shall be metered with instruments having like characteristics, except that the commission may approve the use of instruments of different types if their use does not result in unreasonable discrimination. Either all of the reactive meters which may run backwards or none of the reactive meters used for measuring reactive power under one schedule shall be ratcheted.

Wis. Admin. Code Public Service Commission PSC 113.0815

CR Register, July, 2000, No. 535, eff. 8-1-00.