Current through December 30, 2024
Section ATCP 76.04 - Plans and specifications for pools(1) APPROVAL REQUIRED. An operator shall submit pool plans for new construction and obtain approval from the Wisconsin department of safety and professional services pursuant to ch. SPS 390. After July 1, 2023, the following documents shall be kept onsite and made available to the department or its agent upon request: (b) Engineering statements and reports, when applicable.(c) Compliance declaration, if applicable.(d) Conditional Wisconsin department of safety and professional services approvals, if applicable.(e) Final Wisconsin department of safety and professional services inspection approval.(f) Wisconsin department of safety and professional services or department variances, if applicable.(2) MODIFICATIONS. An operator shall submit pool modification plans to the Wisconsin department of safety and professional services pursuant to ch. SPS 390. Documentation shall be made available to the department or its agent upon request as required under sub. (1).(3) CHANGE OF OPERATOR. For a pool constructed prior to July 1, 2023, pool construction plans are not required when a change of operator occurs and a new license is required pursuant to s. ATCP 76.05 (1).Wis. Admin. Code Department of Agriculture, Trade and Consumer Protection ATCP 76.04
Renumbered from DHS 172.04 Register June 2016 No. 726; correction in (4) made under s. 13.92(4) (b) 7, Stats., and correction in (14) made under s. 13.92(4) (b) 6, Stats., Register June 2016 No. 726, eff. 7/1/2016Amended by, CR 18-019: am. (4) Register January 2020 No. 769, eff. 2/1/2020Adopted by, CR 22-021: cr. Register June 2023 No. 810, eff. 9-24-23; correction in (1) (intro.) made under s. 35.17, Stats., Register June 2023 No. 810, eff. 9/24/2023This section is created eff. 9-24-23 by CR 22-021.