The provisions contained in this appendix are not mandatory unless specifically referenced in the adopting ordinance.
Deconstruction. The systematic disassembly of a structure, in order to salvage building materials or components for the primary purpose of reusing materials to the maximum extent possible, with a secondary purpose of recycling the remaining materials.
Demolition. The process of razing, relocating, or removing an existing building or structure, or a portion thereof.
Heavy machinery. Heavy machinery includes, but is not limited to, track hoes, excavators, skid steer loaders, or forklifts.
Recycling. The process of transforming or remanufacturing waste materials into useable or marketable materials for use other than landfill disposal or incineration.
Reuse. The return of a material into the economic stream for use.
Salvage. The recovery of construction and demolition building material and components from a building or site in order to increase the reuse or repurpose potential of these materials and decrease the amount of material being sent to the landfill. Salvaged material may be sold, donated, or reused.
Wash. Admin. Code § 51-51-60109