9 Va. Admin. Code § 25-870-148

Current through Register Vol. 40, No. 22, June 17, 2024
Section 9VAC25-870-148 - [Repealed effective 7/1/2024] Virginia stormwater management program administrative requirements
A. A VSMP shall provide for the following:
1. Identification of the authority accepting complete registration statements and of the authorities completing plan review, plan approval, inspection, and enforcement;
2. Submission and approval of erosion and sediment control plans in accordance with the Virginia Erosion and Sediment Control Law and attendant regulations and the submission and approval of stormwater management plans;
3. Requirements to ensure compliance with 9VAC25-870-54, 9VAC25-870-55, and 9VAC25-870-56;
4. Requirements for inspections and monitoring of construction activities by the operator for compliance with local ordinances;
5. Requirements for long-term inspection and maintenance of stormwater management facilities;
6. Collection, distribution to the state if required, and expenditure of fees;
7. Enforcement procedures and civil penalties where applicable;
8. Policies and procedures to obtain and release bonds, if applicable; and
9. Procedures for complying with the applicable reporting and recordkeeping requirements in 9VAC25-870-126.
B. A locality's VSMP authority shall adopt and enforce an ordinance that incorporates the components set out in subdivisions 1 through 5 and 7 of subsection A of this section. Other VSMP authorities shall provide supporting documentation that incorporates the components set out in subdivisions 1 through 5 of subsection A of this section in a format acceptable to the department.
C. Notice of termination of general permit coverage.
1. A VSMP authority shall recommend that the department terminate coverage under a General VPDES Permit for Discharges of Stormwater from Construction Activities (Construction General Permit) within 60 days of receiving a complete notice of termination from the operator of the construction activity.
2. Coverage under a Construction General Permit shall be deemed to be terminated 90 days after the receipt by the VSMP authority of a complete notice of termination from the operator of the construction activity.
3. If a VSMP authority receives a notice of termination of a Construction General Permit that it determines to be incomplete, the VSMP authority shall, within a reasonable time, inform the operator of the construction activity of such incompleteness and provide the operator with a detailed list itemizing the elements of information that are missing from the notice.

9 Va. Admin. Code § 25-870-148

Derived From Virginia Register Volume 30, Issue 2, eff. October 23, 2013; Amended, Virginia Register Volume 35, Issue 04, eff. 11/14/2018; Repealed, Virginia Register Volume 40, Issue 8, eff. 7/1/2024.

Statutory Authority: § 62.1-44.15:28 of the Code of Virginia; Chapters 68 and 758 of the 2016 Acts of Assembly.