S.D. Admin. R. 74:53:01:33

Current through Register Vol. 51, page 56, November 4, 2024
Section 74:53:01:33 - Absorption or alternative water-carriage system permitted under certain circumstances

An absorption system or alternative water-carriage system may be used when the percolation rate as determined by § 74:53:01:31 or 74:53:01:32 is between 5 and 60 minutes per inch if all other requirements for the absorption system or alternative water-carriage system are met. An alternative water-carriage system must be used when the percolation rate of the soil is slower than 60 minutes per inch or faster than 5 minutes per inch. An absorption system may be used where fill material is used to decrease the percolation rate from more than one but less than 5 minutes per inch to more than 5 but less than 60 minutes per inch.

S.D. Admin. R. 74:53:01:33

12 SDR 2, effective 7/18/1985; 13 SDR 129, 13 SDR 141, effective 7/1/1987; transferred from

General Authority: SDCL 34A-2-93.

Law Implemented: SDCL 34A-2-20, 34A-2-21.