S.D. Admin. R. 61:08:09:19

Current through Register Vol. 51, page 54, October 28, 2024
Section 61:08:09:19 - Hydrostatic pretest - Steam outlet requirements

Each threaded steam outlet from a power boiler, except to the water column, the fusible soft plug and the safety valve connections, must be fitted with a stop valve located as close as practicable to the boiler. Schedule 80 pipe must be used between the boiler and the first stop valve. If a globe valve is used, the inlet pressure must be under the disk of the valve.

S.D. Admin. R. 61:08:09:19

23 SDR 139, effective 3/5/1997.

General Authority: SDCL 34-29A-14.1.

Law Implemented: SDCL 34-29A-14.1.

Hydrostatic pretest -- Pipe requirements, § 61:08:09:15.