S.D. Admin. R. 61:08:08:03

Current through Register Vol. 51, page 56, November 4, 2024
Section 61:08:08:03 - New boiler installation

All new boilers shall be installed to allow for removal of tubes without removing walls or other structures. The front or rear of a boiler larger than 200,000 BTU output shall not be located any closer than three feet to a wall, structure, or other boiler.

S.D. Admin. R. 61:08:08:03

SL 1975, ch 16, § 1; 8 SDR 87, 8 SDR 134, effective 7/1/1982; 12 SDR 151, 12 SDR 155, effective 7/1/1986.

General Authority: SDCL 34-29A-16.

Law Implemented: SDCL 34-29A-24.