S.C. Code Regs. § § 61-79.264.A.3

Current through Register Vol. 48, 12, December 27, 2024
Section 61-79.264.A.3 - Relationship to interim status standards

A facility owner or operator who has fully complied with the requirements for interim status--as defined under R.61-79.270.70 and in section3005(e)(e) of RCRA - must comply with the regulations specified in R.61-79.265 in lieu of the regulations in this part, until final administrative disposition of his permit application is made, except as provided under R.61-79.264, subpart S. (revised 12/92)

[Comment: As stated in Section 44-56-60 and section3005(e)(a) of RCRA, after the effective date of regulations under that section, i.e., parts 270 and 124 of this chapter, the treatment, storage, or disposal of hazardous waste is prohibited except in accordance with a permit under these regulations; the statutes. 44-56-60 and Section3005(a)(e) of RCRA provide for the continued operation of an existing facility which meets certain conditions until final administrative disposition of the owner's or operator's permit application is made.] (revised 12/92)

S.C. Code Regs. § 61-79.264.A.3

Amended by State Register Volume 14, Issue No. 11, eff November 23, 1990; State Register Volume 16, Issue No. 12, eff December 25, 1992; State Register Volume 17, Issue No. 17, eff December 24, 1993.