S.C. Code Regs. § § 61-62.5.3.IV

Current through Register Vol. 48, No. 9, September 27, 2024
Section 61-62.5.3.IV - NOTIFICATION REQUIREMENTS AND COMPLIANCE SCHEDULES
A. Sources in Existence on the Effective Dates of the Standard
1. All sources subject to source testing must be in compliance within one year of February 26, 1988, unless otherwise stated in this standard. Other requirements for specific source types are listed below.
2. Specific Source Types
a. Retail Business Incinerators - Compliance will be required as of February 26, 1988.
b. Crematory Incinerator - Compliance will be required as of February 26, 1988.
c. Sludge Incinerators - Compliance with the opacity limitation will be required as of February 26, 1988.
d. Hazardous Waste Incinerators
(i) All hazardous waste incinerators must notify the Department in writing of their intent to operate, including information regarding the fuel and waste (amount, type(s), specification/analyses) and method of operation within 60 days of February 26, 1988, unless otherwise stated in this standard. The Department will notify the source within 30 days of receipt of this information if a formal permit application is needed.
(ii) Hazardous waste incinerators that require a permit application must make this submittal within 90 days of notification by the Department that a permit application is required.
(iii) Compliance with the opacity limitation will be required as of February 26, 1988.
e. Municipal Waste Combustors
(i) All municipal waste combustors must notify the Department in writing of their intent to operate, including information regarding the fuel and waste (amount, type(s), specification/analyses) and method of operation within 60 days of June 25, 1999, unless otherwise stated in this standard. The Department will notify the source within 30 days of receipt of this information if a formal permit application is needed.
(ii) Municipal waste combustors that require a permit application must make this submittal within 90 days of notification by the Department that a permit application is required.
(iii) Compliance with the opacity limitation will be required as of February 26, 1988.
f. Air Curtain Incinerators
(i) Compliance with Section III.G.1 will be required as of February 26, 1988.
(ii) Compliance with Section III.G.2. and G.4. will be required within 180 days of May 25, 1990.
(iii) Compliance with Section III.G.3. shall be required within 180 days of May 25, 1990, for all permanent sites (that is, sites used more than six months) and within three years of May 25, 1990, for all portable air curtain incinerators used at temporary sites.
g. Commercial Incinerators
(i) All commercial incinerators must notify the Department in writing of their intent to operate, including information regarding the fuel and waste (amount, type(s), specification/analyses) and method of operation within 60 days of June 25, 1999, unless otherwise stated in this standard. The Department will notify the source within 30 days of receipt of this information if a formal permit application is needed.
(ii) Commercial incinerators that require a permit application must make this submittal within 90 days of notification by the Department that a permit application is required.
(iii) Compliance with the opacity limitation will be required as of February 26, 1988.
h. Industrial Incinerators
(i) All industrial incinerators must notify the Department in writing of their intent to operate, including information regarding the fuel and waste (amount, type(s), specification/analyses) and method of operation within 60 days of February 26, 1988, unless otherwise stated in this standard. The Department will notify the source within 30 days of receipt of this information if a formal permit application is needed.
(ii) Industrial incinerators that require a permit application must make this submittal within 90 days of notification by the Department that a permit application is required.
(iii) Compliance with the opacity limitation will be required as of February 26, 1988.
i. Industrial Boilers and Utility Boilers
(i) All industrial boilers and utility boilers must notify the Department in writing of their intent to operate, including information regarding the fuel and waste (amount, type(s), specification/analyses) and method of operation within 60 days of February 26, 1988, unless otherwise stated in this standard. The Department will notify the source within 30 days of receipt of this information if a formal permit application is needed.
(ii) Industrial boilers and utility boilers that require a permit application must make this submittal within 90 days of notification by the Department that a permit application is required.
j. Non-Industrial Boilers - Compliance will be required as of February 26, 1988.
k. Industrial Furnaces
(i) All industrial furnaces must notify the Department in writing of their intent to operate, including information regarding the fuel and waste (amount, type(s), specification/analyses) and method of operation within 60 days of February 26, 1988, unless otherwise stated in this standard. The Department will notify the source within 30 days of receipt of this information if a formal permit application is needed.
(ii) Industrial furnaces that require a permit application must make this submittal within 90 days of notification by the Department that a permit application is required.
l. Non-Industrial Furnaces - Compliance will be required as of February 26, 1988.
B. New Sources - Any source to which this standard is applicable and which is not in existence on the effective dates of this standard must be in compliance with the applicable portions of this standard on the date operation of the source begins.

S.C. Code Regs. § 61-62.5.3.IV

Amended by State Register Volume 37, Issue No. 4, eff April 26, 2013; State Register Volume 40, Issue No. 09, eff. 9/23/2016.