The Department shall conduct preoperational inspection(s) to verify that the retail food establishment is constructed and equipped in accordance with this regulation. The permit holder or representative of the permit holder must request the preoperational inspection fourteen (14) days prior to an inspection to issue a permit.
S.C. Code Regs. § 61-25.8-203