Or. Admin. Code § 632-010-0188

Current through Register Vol. 63, No. 11, November 1, 2024
Section 632-010-0188 - Gas-Oil Ratio Surveys and Reports

Gas-oil ratios and surveys must be taken in the manner prescribed by the board for individual fields where gas-oil ratio limits have been fixed and in accordance with the rules prescribed for each individual pool.

(1) Flowing Wells Intermittently (Stop-Cocked) Produced: In computing the operating gas-oil ratio, the total volume of gas and the total barrels of oil that are produced in order to obtain the daily oil allowable must be used regardless of the flowing time in the 24-hour period.
(2) Gas Lift or Jet Wells: The total volume of gas to be used in computing the operating gas-oil ratio is the total output volume minus the total input volume.
(3) Pumping Wells: Gas withdrawn from the casing in an attempt to maintain a fluid seal, or for any other reason, must be added to the gas produced through tubing in computing the gas-oil ratio.

Or. Admin. Code § 632-010-0188

GMI 1, f. 1-27-54; GMI 1-1982, f. & ef. 6-25-82; GMI 4-1985, f. & ef. 11-20-85; GMI 6-1990, f. & cert. ef. 12-5-90; DGMI 1-2013, f. & cert. ef. 3-21-13

Stat. Auth.: ORS 520

Stats. Implemented: ORS 520.095