Okla. Admin. Code § 785:25-7-3

Current through Vol. 42, No. 3, October 15, 2024
Section 785:25-7-3 - Deficiencies during and after construction
(a) If, after any inspections, investigations, or examinations, or at any time after completion, it is found that amendments, modifications, or changes to the work performed pursuant to the approved plans and specifications are necessary to protect life and insure safety of the dam or to meet acceptable dam safety engineering practices, including those found in references set forth in 785:25-3-4, the owner shall be required to submit a revised application.
(b) If conditions are revealed which will not permit the construction of a safe dam or reservoir, the prior approval may be revoked or modified by the Board after notice and hearing.
(c) After the inspection, investigation, or examination, the Board shall, in a report to the owner, specify the deficiencies and allow a reasonable time for correcting the deficiencies.

Okla. Admin. Code § 785:25-7-3

Amended at 9 Ok Reg 1675, eff 5-11-92