Okla. Admin. Code § 252:517-3-46

Current through Vol. 41, No. 19, June 17, 2024
Section 252:517-3-46 - Completion map
(a)Required map. The permit application shall include a completion map showing how the new CCR unit or lateral expansion of a CCR unit is expected to look when it is completed, including final contours.
(b)Required details. The completion map shall include the permit boundary, disposal boundary, buffer zone, groundwater monitoring well locations, the leachate removal locations, permanent surface drainage structures and aesthetic enhancements.

Okla. Admin. Code § 252:517-3-46

Adopted by Oklahoma Register, Volume 33, Issue 24, September 1, 2016, eff. 9/15/2016