Okla. Admin. Code § 252:517-3-45

Current through Vol. 42, No. 4, November 1, 2024
Section 252:517-3-45 - Top of liner contour map
(a)Required map. The permit application shall include a top of liner contour map showing:
(1) contours, at two foot intervals, of the top of the liner; and
(2) the locations of the proposed monitor wells.
(b)Liner construction. Details of liner construction may be provided on this map or as a separate drawing.

Okla. Admin. Code § 252:517-3-45

Adopted by Oklahoma Register, Volume 33, Issue 24, September 1, 2016, eff. 9/15/2016