Okla. Admin. Code § 252:515-25-53

Current through Vol. 41, No. 19, June 17, 2024
Section 252:515-25-53 - Contents of post-closure plan

The post-closure plan shall include, as a minimum:

(1) identification of site-specific post-closure activities with a detailed narrative description of how each is expected to be performed and a schedule for completing all activities;
(2) calculation of post-closure cost estimates in accordance with Subchapter 27 of this Chapter;
(3) a schedule for a minimum of quarterly inspections of the facility;
(4) procedures for:
(A) repairing and maintaining all surface drainage structures and on-site permanent improvements and equipment; and
(B) reworking or replacing any defective groundwater monitor wells and other defective monitoring equipment and installing new wells and equipment as required;
(5) procedures for maintaining the leachate collection system and collecting, treating and properly disposing of leachate;
(6) protocol for collecting and analyzing soil and water (surface and subsurface) samples as required;
(7) methods for maintaining site security and access control;
(8) procedures for:
(A) maintaining vegetation and other erosion controls in the post-closure area; and
(B) repairing erosion and maintaining final cover to meet the requirements of OAC 252:515-19-53, including the schedule for mowing and fertilizing final cover vegetation and other areas as needed;
(9) documentation of a legal right to enter, use, maintain, and monitor the facility throughout the post-closure period, in accordance with OAC 252:515-3-34;
(10) the outline for preparing the annual post-closure report in accordance with OAC 252:515-25-54(a)(2);
(11) the requirements for preparing a certification of post-closure performance in accordance with OAC 252:515-25-56;
(12) a description of the planned future uses, if any, of the property during the post-closure period; and
(13) a description of any other tasks necessary to accomplish adequate post-closure care.

Okla. Admin. Code § 252:515-25-53