Okla. Admin. Code § 252:515-25-52

Current through Vol. 41, No. 19, June 17, 2024
Section 252:515-25-52 - Extension of post-closure period
(a)Extension. The DEQ may extend the post-closure monitoring and care period if:
(1) sampling shows the presence of elevated levels of any constituent;
(2) evidence of contamination resulting from site operations is found to exist;
(3) prior maintenance or monitoring of the site is found to be inadequate;
(4) the site is producing leachate that must be treated prior to discharge; or
(5) if other conditions are present that indicate a need for additional post-closure monitoring and care.
(b)Additional requirements. When the post-closure period is extended, the DEQ may require the maintenance of existing financial assurance, the posting of additional assurance, and/or may require corrective action.

Okla. Admin. Code § 252:515-25-52

Added at 20 Ok Reg 1151, eff 6-1-03