Okla. Admin. Code § 252:515-11-75

Current through Vol. 41, No. 19, June 17, 2024
Section 252:515-11-75 - Protective layer

Upon completion of construction or excavation, the in-situ liner must be covered with a 12-inch soil protective layer and maintained to minimize desiccation.

Okla. Admin. Code § 252:515-11-75

Added at 20 Ok Reg 1151, eff 6-1-03