All boreholes must be plugged with pelletized or chipped bentonite and rehydrated after the core sampling is completed.
Okla. Admin. Code § 252:515-11-74
All boreholes must be plugged with pelletized or chipped bentonite and rehydrated after the core sampling is completed.
Okla. Admin. Code § 252:515-11-74