Current through Vol. 42, No. 8, January 2, 2025
Section 252:515-11-55 - Reconstructed clay liner(a)Requirements. The reconstructed clay liner on which the FML is installed must:(1) be of uniform grade with no ruts; and(2) meet the liner construction requirements of OAC 252:515-11-35(c)(4).(b)Daily certification. Prior to placement of the FML, the QA officer shall certify daily that the reconstructed clay liner meets: (1) the moisture requirements of Part 3 of this Subchapter and the QA/QC plan; and(2) the requirements of (a) of this Section.Okla. Admin. Code § 252:515-11-55
Added at 20 Ok Reg 1151, eff 6-1-03