Prior to the construction of any injection well to be utilized for the extraction of minerals or energy, an operator shall obtain an underground injection control permit pursuant to chapter 43-02-02.1.
N.D. Admin Code 43-02-02.4-20
General Authority: NDCC 38-12-02
Law Implemented: NDCC 38-12-02