N.D. Admin. Code 33-24-08-26

Current through Supplement No. 393, July, 2024
Section 33-24-08-26 - Periodic operation and maintenance walkthrough inspections
1. To properly operate and maintain underground storage tank systems, not later than April 1, 2021, owners and operators shall meet one of the following:
a. Conduct a walkthrough inspection that, at a minimum, checks the following equipment as specified below:
(1) Every thirty days (Exception: spill prevention equipment at underground storage tank systems receiving deliveries at intervals greater than every thirty days may be checked prior to each delivery):
(a) Spill prevention equipment - Visually check for damage; remove liquid or debris; check for and remove obstructions in the fill pipe; check the fill cap to make sure it is securely on the fill pipe; and, for double walled spill prevention equipment with interstitial monitoring, check for a leak in the interstitial area; and
(b) Release detection equipment - Check to make sure the release detection equipment is operating with no alarms or other unusual operating conditions present, and ensure records of release detection testing are reviewed and current; and
(2) Annually:
(a) Containment sumps - Visually check for damage, leaks to the containment area, or releases to the environment; remove liquid (in contained sumps) or debris; and, for double walled sumps with interstitial monitoring, check for a leak in the interstitial area; and
(b) Hand-held release detection equipment - Check devices such as tank gauge sticks or groundwater bailers for operability and serviceability;
b. Conduct operation and maintenance walkthrough inspections according to a standard code of practice developed by a nationally recognized association or independent testing laboratory that checks equipment comparable to subdivision a of subsection 1 of section 33-24-08-25; or

(NOTE: The following code of practice may be used to comply with subdivision b of subsection 1 of section 33-24-08-26: Petroleum Equipment Institute Recommended Practice RP 900, "Recommended Practices for the Inspection and Maintenance of UST Systems".)

c. Conduct operation and maintenance walkthrough inspections developed by the department that checks equipment comparable to subdivision a of subsection 1.
2. Owners and operators shall maintain records, in accordance with section 33-24-08-24, of operation and maintenance walkthrough inspections for one year. Records must include a list of each area checked, whether each area checked was acceptable or needed action taken, a description of actions taken to correct an issue, and delivery records if spill prevention equipment is checked less frequently than every thirty days due to infrequent deliveries.

N.D. Admin Code 33-24-08-26

Amended by Administrative Rules Supplement 368, April 2018, effective 4/1/2018.

General Authority: NDCC 23-20.3-03, 23-20.3-04.1

Law Implemented: NDCC 23-20.3-04.1