N.D. Admin. Code 33-24-05-1103

Current through Supplement No. 393, July, 2024
Section 33-24-05-1103 - Testing

All new tanks and ancillary equipment must be tested for tightness before being placed into use. If a tank system is found not to be tight, all repairs necessary to remedy the leaks in the system must be performed prior to covering, enclosing, or placing the tank system into use.

N.D. Admin Code 33-24-05-1103

Adopted by Administrative Rules Supplement 2016-359, January 2016, effective 1/1/2016.

General Authority: NDCC 23-20.3-03

Law Implemented: NDCC 23-20.3-03, 23-20.3-04, 23-20.3-05