Current through Register Vol. 35, No. 23, December 10, 2024
Section 17.9.568.19 - COST SHARING FOR INTERCONNECTION UPGRADESA. The cost of utility system modifications required pursuant to the fast track process or the full interconnection study process shall be borne by the applicant unless otherwise agreed to by the parties or following a determination by the commission that some or all of the costs constitute system benefits eligible for cost-sharing options: (1) The commission may determine on a case-by-case basis whether the cost of distribution system upgrades necessary to interconnect one or more generating facilities may be eligible for some form of costsharing:(a) among several developers using the same distribution facilities;(b) among all ratepayers of the qualifying utility via rate base adjustments; or(c) among ratepayers of the same rate class as subscribers to the community solar facility via a rate rider for that class.(2) In making such a determination that there are public benefits to such a cost-sharing mechanism, the commission shall employ the same analysis as provided for cost-sharing or rate basing grid modernization projects as defined by Section 62-8-13 NMSA 1978 (Grid Modernization Act 2019, HB 233) to make a finding that the approved expenditures are:(a) reasonably expected to improve the public utility's electrical system efficiency, reliability, resilience and security; maintain reasonable operations, maintenance and ratepayer costs; and meet energy demands through a flexible, diversified and distributed energy portfolio;(b) reasonably expected to increase access to, and use of, clean and renewable energy, with consideration given to increasing access to low-income subscribers and subscribers in underserved communities;(c) designed to contribute to the reduction of air pollution, including greenhouse gases;(3) Expenditures approved for such cost sharing of necessary interconnection upgrades shall not be considered a "subsidization" subject to the three percent limitations spelled out in this rule or in the Community Solar Act.N.M. Admin. Code § 17.9.568.19
Adopted by New Mexico Register, Volume XXXIV, Issue 03, February 14, 2023, eff. 2/14/2023