N.J. Admin. Code § 5:80-33.21

Current through Register Vol. 56, No. 21, November 4, 2024
Section 5:80-33.21 - Application needs analysis
(a) Section 42(m)(2)(a) of the Code provides: "The housing credit dollar amount allocated to a project shall not exceed the amount the housing credit agency determines is necessary for the financial feasibility of the project and its viability as a qualified low-income housing project throughout the credit period." This determination, known as the "needs analysis," shall be performed by NJHMFA with respect to those applications fulfilling the eligibility requirements at N.J.A.C. 5:80-33.12. In the needs analysis, NJHMFA shall compare the project's total development costs to the funding sources the applicant has identified to meet those costs. As part of its obligation pursuant to Section 42(m)(2) of the Code, NJHMFA shall determine the reasonableness of the developmental and operational costs of the project and may make adjustments to costs as necessary to ensure the viability of the project throughout the credit period and compliance with the QAP. Such adjustments shall not trigger a point deduction pursuant to N.J.A.C. 5:80-33.15(a)24. If the total funding sources not including tax credit equity are less than the total development costs, then a funding gap exists and the applicant has demonstrated a need for credits, provided, however, that the following conditions are satisfied:
1. The project's development and operational costs are reasonable as required under Section 42(m)(2)(B)(iv) of the Code;
2. Funding sources identified by the applicant meet the requirements at N.J.A.C. 5:80-33.12(c)6;
3. The project is financially feasible in terms of the existence of sufficient sources to pay for total development costs; and
4. The project shall remain viable throughout the credit period.
(b) Financing arrangements shall be evaluated to ensure that projects are not structured to artificially increase basis. Such arrangements include drawing down entire bridge or secondary loans at construction closing instead of using such financing on an as-needed basis. NJHMFA reserves the right to assume a mortgage higher than the mortgage commitment submitted by the applicant if it is determined that the mortgage amount stated in the commitment is underestimated. If NJHMFA has a reasonable basis for concluding the equity factor submitted by the applicant is inconsistent with market conditions, NJHMFA reserves the right to adjust the equity factor in its underwriting. NJHMFA reserves the right to require an appraisal at the applicant's expense. If the applicant acquires the property for more than appraised value, the overage shall be added to the sources of funds so as not to create artificial need.
(c) NJHMFA shall perform needs analyses at three separate times: application, allocation, and at the time the project is placed in service. (See N.J.A.C. 5:80-33.23 and 33.27.) Pursuant to section 31 of the Protecting Americans from Tax Hikes Act of 2015, the applicable credit percentage shall be nine percent for the 70 percent present value credit. The credit amount reserved is limited to the lesser of:
1. The credit amount based on the needs analysis; or
2. The credit amount generated from the project's qualified basis, as (potentially) capped by the eligible basis limits. Unless a project has an alternate funding source such as a developer fee able to be deferred, a project whose eligible basis is reduced by the eligible basis limits (thereby reducing the credit amount) may be declared infeasible due to a funding gap caused by the resulting shortfall in syndication proceeds.
(d) Buildings placed in service after July 30, 2008 that receive the 70 percent value credit shall be eligible for up to a 30 percent boost in eligible basis to the extent that the developer can demonstrate that the boost is necessary to achieve financial feasibility.

N.J. Admin. Code § 5:80-33.21

Amended by 49 N.J.R. 435(a), effective 3/6/2017
Amended by 56 N.J.R. 343(b), effective 3/4/2024