Current through Register Vol. 56, No. 21, November 4, 2024
Section 5:23-6.10 - Basic requirements and supplemental requirements-general(a) The basic requirements, set forth in 5:23-6.11 for all groups and for individual groups in 5:23-6.12 through 6.28, shall be met within or with regard to the work area in all reconstruction projects. (These requirements are in addition to the requirements contained in 5:23-6.8, Materials and methods.)(b) The supplemental requirements, set forth in 5:23-6.11A for all groups and for individual groups in 5:23-6.12A through 6.28A, shall be met in all buildings where there are reconstruction projects that meet or exceed the stated threshold for each requirement. 1. All reconstruction work begun within a single 12 month period shall be considered for determining the applicability of the supplemental requirement.2. If a project falls under the threshold for a supplemental requirement by a de minimis amount, the construction official may require that the supplemental requirement be met.(c) Reconstruction projects contained in mixed use buildings shall comply with the requirements of 5:23-6.29 as applicable.(d) Special technical specifications for windowless stories, the supervision of automatic sprinkler systems, automatic sprinkler system risers, acceptances of existing alarm and automatic sprinkler systems, smoke barriers, elevators and specific occupancy areas are established in 5:23-6.30. The windowless story, supervision of automatic sprinkler systems and smoke barrier special technical requirements shall apply only in those uses where specified by this subcode.N.J. Admin. Code § 5:23-6.10
Amended by R.2004 d.145, effective 4/5/2004.
See: 35 N.J.R. 5190(a), 36 N.J.R. 1758(a).
Deleted references to use preceding references to group throughout; in (d), substituted references to automatic sprinkler for references to fire suppression throughout.