Current through Register Vol. 56, No. 23, December 2, 2024
Section 19:39-2.6 - Set-asides and goals for DVOB contractors on school facilities projects(a) At the time of each school facilities project advertisement, the Authority shall announce the DVOB requirements for the contract, and a construction contractor or goods and services contractor shall be required to make a good faith effort to comply fully with the DVOB subcontracting goals.(b) The SDA may set aside a school facilities construction or goods and services contract for a DVOB contractor, whenever there is a reasonable expectation that bids or proposals may be obtained from at least three qualified DVOB firms capable of providing the desired services. The designation shall be made prior to advertisement for bids.(c) When practicable, the SDA will issue several smaller contracts, in place of one large contract, in order to increase the ability of DVOBs to bid on school facilities projects.N.J. Admin. Code § 19:39-2.6
Amended by 47 N.J.R. 1651(c), effective 7/6/2015Adopted by 54 N.J.R. 2401(a), effective 12/19/2022