Current through Register Vol. 57, No. 1, January 6, 2025
Section 19:39-2.5 - Set asides and goals for SBE contractors on school facilities projects(a) At the time of each school facilities project advertisement, the Authority shall announce the SBE requirements for the contract, and a construction contractor or goods and services contractor shall be required to make a good faith effort to comply fully with the SBE subcontracting goals.(b) The SDA may set aside a school facilities construction or goods and services contract for an SBE, whenever there is a reasonable expectation that bids or proposals may be obtained from at least three qualified SBE firms capable of providing the desired services. The designation shall be made prior to advertisement for bids.(c) When practicable, the SDA will issue several smaller contracts, in place of one large contract, in order to increase the ability of SBEs to bid on school facilities projects.N.J. Admin. Code § 19:39-2.5
Recodified from N.J.A.C. 19:32-5.9 and amended by R.2007 d.380, effective 12/17/2007.
See: 39 N.J.R. 2003(a), 39 N.J.R. 5369(a).
Section was "Set asides and goals for MBE, WBE, and SBE contractors and consultants on school facilities projects". Rewrote the section.