Current through Register No. 50, December 12, 2024
Section Res 5401.03 - Notification of Permit to Float Timber on Surface Waters(a) The director shall approve an application to float timber on surface waters of the state if the application is complete, all permits required pursuant to Res 5401.02(c) have been obtained, and the impacts to natural and recreational resources are minimal as determined in consultation with the New Hampshire department of environmental services.(b) If the director approves an application to float timber on surface waters, the director shall issue a permit to the applicant within 30 days after receipt of the application. Failure by the director to notify the applicant within 30 days shall serve as automatic permit approval.(c) If the director determines that the application is deficient in any respect, the director shall, within 10 working days of receipt of the deficient application, notify the applicant in writing of the specific deficiencies and allow the applicant to amend the application.(d) If the director does not approve an application to float timber on surface waters of the state pursuant to (a) above, the director shall notify the applicant in writing of the specific reason(s) for denial within 30 days after receipt of the application.N.H. Admin. Code § Res 5401.03
#8441, eff 10-1-05; ss by #10547, eff 3-21-14