Current through Register No. 50, December 12, 2024
Section Env-Wt 512.06 - Breakwater Construction Project Classification(a) Breakwater construction shall be a major project, regardless of the size of the breakwater.(b) Classification as a major project pursuant to (a), above, shall: (1) Take precedence over any lower classification; and(2) Not be subject to a waiver.N.H. Admin. Code § Env-Wt 512.06
Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.