N.H. Admin. Code § Env-Wt 512.05

Current through Register No. 50, December 12, 2024
Section Env-Wt 512.05 - Breakwater Construction Requirements

In addition to meeting all applicable construction standards established in Env-Wt 307, the following shall apply to breakwater construction projects:

(a) The breakwater shall be constructed as shown in the approved plans and specifications;
(b) No rocks shall be stockpiled in any jurisdictional area unless the applicant:
(1) Specifically requests authorization for such stockpiling in the application and receives such authorization in the permit; and
(2) Documents in the application that the limited and difficult access to the site precludes stockpiling outside of jurisdictional areas;
(c) Any rocks stockpiled in jurisdictional areas shall be removed:
(1) As soon as practicable; and
(2) In every case, by the conclusion of construction on the breakwater; and
(d) Rocks from the frontage of the subject property shall be used as a source of breakwater material only if:
(1) The applicant specifically requests authorization for such use in the application and receives such authorization in the permit; and
(2) The rocks are removed from another structure on the frontage for the purpose of constructing the breakwater and are not dug or blasted out of the ground.

N.H. Admin. Code § Env-Wt 512.05

Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.