Current through Register No. 45, November 7, 2024
Section Env-Wt 511.06 - Water Access Structure Construction Project Classifications(a) Construction of a water access structure shall be a minimum impact project only if all of the following criteria are met:(1) No construction surface area, filling, or dredging occurs below the normal high water line or ordinary high water mark, as applicable;(2) No work is done in a wetland or PRA, except as provided in Env-Wt 407;(3) The combination of existing and proposed water access structures does not use more than 20 percent of the applicant's contiguous shoreline up to a maximum of 50 feet;(4) A maximum of 10 CY of sand is used; and(5) The total area impacted by water access structures does not exceed 250 SF.(b) Construction of a beach shall be a minor impact project if the project complies with (a)(1) through (4), above, and either:(1) The project uses more than 10 CY of sand but not more than 20 CY of sand; or(2) The aggregate area impacted by water access structures is 250 SF or greater but does not exceed 500 SF.(c) Construction of a deck or patio shall be a minor impact project if:(1) The project complies with (a)(1) through (4), above; and(2) The aggregate area impacted by water access structures is 250 SF or greater but does not exceed 500 SF.(d) Construction of a water access structure shall be a major project if the project does not meet the criteria for a minimum impact project specified in (a), above, or for a minor impact project specified in (b) or (c), above.N.H. Admin. Code § Env-Wt 511.06
Derived from Volume XXXIX Number 28, Filed July 11, 2019, Proposed by #12805, Effective 12/15/2019, Expires 12/15/2029.Amended by Volume XL Number 2, Filed January 9, 2020, Proposed by #12954, Effective 12/24/2019, Expires 12/24/2029.Amended by Volume XL Number 41, Filed October 8, 2020, Proposed by #13124 Effective 10/23/2020, Expires 10/23/2030.