Current through Register No. 44, October 31, 2024
Section Env-Wq 708.02 - Required Redundancy(a) Standby units shall be provided for all critical components.(b) For pumps and other critical hydraulic components, the WWTP shall have one standby unit for every 3 units, or fraction thereof, required to handle peak design flow or load.N.H. Admin. Code § Env-Wq 708.02
(See Revision Note at chapter heading for Env-Wq 700) #8590, eff 3-25-06
Amended byVolume XXXIV Number 46, Filed November 13, 2014, Proposed by #10693, Effective 10/15/2014, Expires10/15/2024.