Current through Register No. 44, October 31, 2024
Section Env-Wq 1206.06 - Change in Discharge(a) A commercial facility proposing a new discharge or a change in quantity of its existing discharge shall obtain a new discharge permit application from the community in which the discharge is proposed and submit the completed application to the WRBP at least 30 days prior to the commencement of such discharge.(b) If the new or modified/increased discharge requires the construction and installation of additional treatment devices, the owner of the facility shall submit to the WRBP plans and specifications of the proposed pretreatment facility. If designing the proposed pretreatment facility constitutes the "practice of engineering" as defined in RSA 310-A:10, 2, III, the plans and specifications shall be stamped by a professional engineer licensed to practice in the state of New Hampshire.N.H. Admin. Code § Env-Wq 1206.06
#8235, eff 12-22-04 (See Revision Note at chapter heading for Env-Wq 1200) (formerly Env-Ws 1206.06); ss by #9798-A, eff 10-9-10
Amended by Volume XXXIX Number 16, Filed April 18, 2019, Proposed by #12739, Effective 3/19/2019, Expires 3/19/2029.