N.H. Admin. Code § Env-Wq 1205.05

Current through Register No. 44, October 31, 2024
Section Env-Wq 1205.05 - IDP Contents
(a) The IDP shall identify the general and specific conditions under which the industrial waste shall be acceptable for discharge to the POTW.
(b) Each IDP shall specifically include the following:
(1) A statement that indicates the permit duration;
(2) Requirements for self-monitoring, sampling, reporting, notification, and record-keeping, including an identification of pollutants to be monitored, sampling location, sampling frequency, and sample type based on federal, state, and local rules;
(3) Effluent limitations for the industrial waste based on applicable pretreatment standards; and
(4) Requirements to modify the permit as necessary to conform to discharge limitation requirements or other requirements enacted by federal, state, or community rules and/or regulations.
(c) For users with reporting requirements, the IDP shall require the report to:
(1) Contain the following:
a.Information necessary to determine the compliance status of the user, in the form of periodic monitoring results indicating the nature and concentration of pollutants in the pretreatment effluent discharge from the regulated processes governed by pretreatment standards, or documentation of compliance with a best management practice (BMP) or pollution prevention alternative, if required by the pretreatment standard;
b.The average and maximum daily permitted process flow;
c.Whether the applicable categorical pretreatment standards and requirements are being met on a consistent basis and, if not, what additional operation and maintenance practices and/or pretreatment systems will be implemented to bring the user into compliance; and
d.Any analytical results monitored more frequently than required by the IDP; and
(2) Be signed and certified pursuant to Env-Wq 1205.09.
(d) Each IDP shall contain:
(1) Limits on the maximum or average rate of discharge or both, time of discharge, and requirements for flow regulation and equalization;
(2) Requirements for the development and implementation of spill control plans or other special conditions including management practices necessary to prevent accidental, unanticipated, or non-routine discharges;
(3) Requirements for installation and maintenance of sampling facilities and equipment;
(4) Other special permit conditions as deemed necessary by the WRBP to ensure compliance with these rules, federal laws, rules, and regulations; and
(5) Requirements for pretreatment and self-monitoring facilities and a schedule for the user to acquire and install such facilities if they do not already exist.

N.H. Admin. Code § Env-Wq 1205.05

#2707, eff 5-15-84, EXPIRED: 5-15-90

New. #4845, eff 6-20-90, EXPIRED: 6-20-96

New. #6304, eff 7-26-96; ss by #8124, INTERIM, eff 7-26-04, EXPIRES: 1-22-05; ss by #8235, eff 12-22-04 (See Revision Note at chapter heading for Env-Wq 1200) (formerly Env-Ws 1205.05); ss by #9798-A, eff 10-9-10

Amended by Volume XXXIX Number 16, Filed April 18, 2019, Proposed by #12739, Effective 3/19/2019, Expires 3/19/2029.